918.com


021-54179188

IGMS Full Process Business

Coke Industry

1. SO₂ in exhaust is mainly produced in coke oven, and SO₂ concentration is around 0-30mg/m³;

2. Leak ammonia concentration in exhaust is less than 50mg/m³;

3. Water content in exhaust is relatively high, around 5-15%.

Characteristics of Coke Industry Exhaust treatment


1.jpg                           564.png


1.In the coking process, in order to reducing NOx emission to meet local emission standards, there are different denitration processes. Denitration by oxidation method will cause incomplete absorption of NO₂ and excessive emission of NO₂; the other is denitration by aqueous ammonia, in this case, over-dosed ammonia is leaked. Although some of the subsequent desulfurization processes can absorb ammonia, but partial ammonia will leak and enter into atmosphere;

2.Condensed water, leaked ammonia and SO₂ will react together to ammonia salt, which will absorb SO₂ in flue gas, and lead to lower SO₂ reading or 0 SO₂ reading.


Main Problems of onsite CEMS

1.CEMS T90 response time is far more than 200s for SO₂ whole CEMS calibration, which can’t meet the requirements of 6.2.1.2 in the national standard HJ76-2017;

2.CEMS indication error is far more than ±2.5% for SO₂ whole CEMS calibration, which can’t meet the requirements of 6.2.1.3 in the national standard HJ76-2017;

3.There are condensed water and ammonia salt deposit in the pipeline of CEMS, which block the pipeline and lead to frequent maintenance of the system.


Recommended Solution

Recommend PreGASS-2300 ammonia scrubber and PreGASS-9500 precondition systems to handle ammonia salt and condensed water problems, retain target acid gases, in order to guarantee precision of monitoring system, and keep CEMS operated in a long-term, stable and reliable way, and realize the real reaction of procedure actual operation.


image.png

PreGASS-2500 ammonia scrubber system                                    PreGASS-9500 preconditiioning system


1.AlwaysBrong provides professional on-site survey service to fully understand the actual operation and problems of on-site CEMS;

2.evalsuate based on specific conditions and problems onsite, and put forward professional tailor-made solutions;

3.Complete on-site installation and commissioning, ensure the correct implementation of the solution and achieve the corresponding performance;

4.Continuously track the operation of the system to ensure that the problems have been solved and meet the expectations of the solution.


XML地图