918.com


021-54179188

Cement Industry

Cement Industry

1.SO₂ in exhaust mainly comes from raw material minerals, and SO₂ concentration is around 30-50mg/m³;

2.Leak ammonia concentration in exhaust is high, around 50-200mg/m³;

3.Water content in exhaust is relatively high, around

Characteristics of Cement Industry Exhaust treatment


1566454689138979.jpg


1.Usually there is no FGD in cement process, and the removal of SO₂ in flue gas is usually realized by the raw mill process, so the start and stop of the raw mill will affect the concentration of SO₂ in exhaust gas;

2.In the cement process, ammonia is injected into the Preheaters for de-NOx, which belongs to the SNCR process. Due to the low efficiency of SNCR for NOx removal, the NOx concentration in the flue gas is generally controlled by excessive ammonia injection, so the ammonia leakage concentration in the flue gas is high;

3.The moisture content in flue gas is relatively high, generally around 5% - 15%; especially when raw material is preheated and dried with raw mill puttiing into operation, the moisture content in flue gas will increase to 10% - 15%.


Main Problems of Cement Enterprises

1.Enterprise performance level rating urgently requires professional guidance and assistance in organized, unorganized emissions, and clean transportation;

2.Iron and steel enterprises need to strengthen their own management of online monitoring, urgently requiring professional personnel to provide guidance and suggestions on the standardization and operation of online monitoring equipment, as well as supervision and management of third-party operation and testing units, in order to improve their own management level;

3.After completing ultra-low emissions, enterprises need to ensure the authenticity, accuracy, and completeness of online monitoring data to self verify their innocence.


Main Problems of onsite CEMS

1.CEMS T90 response time is far more than 200s for SO₂ whole CEMS calibration, which can’t meet the requirements of 6.2.1.2 in the national standard HJ76-2017;

2.CEMS indication error is far more than ±2.5% for SO₂ whole CEMS calibration, which can’t meet the requirements of 6.2.1.3 in the national standard HJ76-2017;

3.There are condensed water and ammonia salt deposit in the pipeline of CEMS, which block the pipeline and lead to frequent maintenance of the system.

Recommended Solution

1. Overall consulting services:

a. Conduct inspections on the installation standardization of online equipment for pollution source discharge outlets in cement enterprises;

b. Production/governance/online/manual comparative monitoring, four simultaneous data analysis;

c. Supervised assessment and evalsuation of third-party operation and maintenance/testing units;

d. Customized professional technical training services;


2. Deep detection service:

a. Conventional gaseous pollutant comparison testing;

b. Ammonia escape, CPM deep testing;


3. Data normalization and full compliance plan

a. Chunxi Co., Ltd. provides specialized and customized solutions (ammonia removal and dehumidification pre-treatment system) based on the on-site

 investigation of problems and the issue of non-compliance throughout the entire process

c. Continuously track the operational status of the system to ensure that issues have been resolved;

d. Ensure that online monitoring data is "true, accurate, and complete", and verify the ultra-low emission effect.



Recommend PreGASS-2400 ammonia scrubber and PreGASS-9600 precondition systems to handle ammonia salt and condensed water problems, retain target acid gases, in order to guarantee precision of monitoring system, and keep CEMS operated in a long-term, stable and reliable way, and realize the real reaction of procedure actual operation.


00.png      000.png


PreGASS-2400 ammonia scrubber system                                    PreGASS-9600 preconditiioning system


1.AlwaysBrong provides professional on-site survey service to fully understand the actual operation and problems of on-site CEMS;

2.evalsuate based on specific conditions and problems onsite, and put forward professional tailor-made solutions;

3.Complete on-site installation and commissioning, ensure the correct implementation of the solution and achieve the corresponding performance;

4.Continuously track the operation of the system to ensure that the problems have been solved and meet the expectations of the solution.



XML地图